Engineering field notes
Practical material for preparing a technical enquiry, specifying a camera acceptance test and planning audio zones.
Before requesting a project estimate
A useful brief names the operation to improve, the data available and the test that will show success. Separate facts you can verify today from assumptions that need a prototype. This gives a development team a basis for estimating research and implementation separately.
Notes for work on site
The CCTV guide provides a camera inventory and an event review test to run before deployment. The audio planning guide starts with how each room is used and the existing equipment. Both can be used to collect inputs for an engineering enquiry.
