From a technical brief to deployment
How a project moves through requirements, feasibility, architecture, a commercial proposal, delivery, testing and agreed support.
Discuss the task and analyse the requirements
We start with the operation that needs to change, the people who perform it and the equipment they use. We agree on the system boundaries, the constraints on data and the result the customer will use to decide whether the project worked.
Check feasibility and design the architecture
Where an interface, model or device is uncertain, we agree on a small test with representative inputs. The architecture records which work runs on the device, which work runs on a server and how the two behave if the connection fails.
Agree on a commercial proposal
The proposal identifies deliverables, acceptance criteria, dependencies and responsibilities. Schedule and cost depend on the scope, available hardware and access to the target environment. Open questions can become a separate research stage.
Build in stages and test
Each stage has a result the customer can examine. Tests cover the normal workflow and agreed failure cases. For equipment integrations, the acceptance plan specifies the hardware models, firmware and operating conditions used.
Deploy and arrange ongoing support
We agree on the rollout window, installation responsibilities and how to return to the previous version if necessary. The handover covers operation, diagnostics and maintenance. Response times and further development are agreed separately.